✔ Delivery within 48 hours*
✔ Successful in 17 countries
✔ 250+ points of sale
✔ 50,000+ satisfied customers
✔ Delivery within 48 hours*
✔ Successful in 17 countries
How To Use The Flexible Rubble Chute?
To make things as easy and clear as possible, we’ve created a step-by-step guide below. You can also watch our video tutorial by clicking the link.
Step 1: Attach The Flexible Rubble Chute to the Filling Funnel
The first step is to secure the flexible rubble chute to the filling funnel (available for purchase in our online shop). While it is possible to use the chute independently or integrate it into a custom configuration, we strongly recommend using our dedicated filling funnel to ensure optimal performance and ease of use.

Step 2: Connect Additional Sections if Necessary
The second step is to connect multiple sections, if needed. This process is very simple, and every order includes free connecting materials. Each flexible rubble chute is 3 metres long and can easily be connected to another section or shortened as required.

Step 3: Anchor the Funnel to the Building
The final step is to secure the flexible rubble chute and filling funnel to the building. For the safest and easiest installation, we recommend bringing the chute inside to the designated floor and deploying it outward. Alternatively, if working from the ground, the chute can be hoisted into position using a rope.

Step 4: Secure the Flexible Rubble Chute to the Collection Point
The fourth step is to anchor the flexible rubble chute to the container on the ground. It can also be fastened to a Big Bag, wheelbarrow, or any other suitable receptacle. Ensure that the end of the chute is positioned no more than 50 cm above the container. Mounting it at a greater height is not recommended, as it may compromise the safety of both the operator and the immediate work area.

Step 5: Start Disposing of Debris
Your system is now ready for use. You can begin loading the flexible rubble chute using a bucket or wheelbarrow, or by depositing loose materials directly into the funnel. To ensure a smooth, unobstructed flow, always double-check that the chute is positioned as vertically as possible and remains free from any bends or kinks.
