Flexible rubble chute Ø50 cm
The essential 3-metre flexible section for creating the drop route.
View the flexible chuteWatch the official Stortslurf® video, then follow the practical steps for a clear, controlled route from the work area to the collection point.
The flexible chute is designed to guide rubble, roof gravel and other suitable building waste from the working level into a container below. Plan the full route first: where it will attach, how it will run, and where the material will land.
Use the video alongside these practical steps. Every site is different, so ensure the attachment, route and collection point are suitable before use.
Hang the chute loops on the funnel hooks to create a controlled entry point for the material.
Join additional 3-metre sections with the supplied cable ties to make a route that suits the working height.
Use a suitable secure point, such as a window frame, balcony or downpipe, with a rope or tension strap as appropriate to the site.
Keep the chute as vertical as practical and position the lower end no more than 50 cm above the container or wheelbarrow.
Confirm that the connections are secure and the path is clear before directing suitable material into the chute.
Stortslurf® provides the flexible material route. Safe access, secure attachment, a clear drop path and the collection area remain site-specific decisions.
Read common set-up questionsThe essential 3-metre flexible section for creating the drop route.
View the flexible chuteCreates a wider, guided entry point and connects directly with the Ø50 cm chute.
View the filling funnelA pair of straps for a secure attachment where they suit the planned set-up.
View lashing strapsOrder direct from Stortslurf® UK with delivery within 2 working days.